Home / Projects
Projects
Projects from the production floor.
Four examples from more than 500 completed projects. Each with starting point, solution and result.
Legacy Tools · aKit
Trikon Delta tool migrated from DOS 6.22 to aKit.
A tool from the year 2000 runs on current PCs today, with all its recipes.
- In production since 2000, operator PC running DOS 6.22.
- Process data cannot be evaluated fully automatically.
- The original software does not run on current PCs.
- Without old spare PCs, the complete loss of the tool is looming.
The Delta software was analysed and fully migrated to aKit through reverse engineering.
- Operation on current PCs with Windows 11 or Linux
- All recipes converted to a new format
- Processes successfully re-qualified
PDC · Equipment data
Equipment data captured centrally.
Data from sensors, machines and manual entries comes together in one place.
- Data from sensors, machines and manual entries is scattered.
With PDC (Plant Data Collection), equipment data is captured from all sources.
- Central capture of equipment data
- Traceability across all sources
Dicing Saw · SECS/GEM
Disco DFD6362 connected to the customer's own fab software.
A dicing saw now talks to the customer's own fab software via SECS/GEM.
- The customer is building its own fab management software.
- SECS/GEM communication and experience with SEMI interfaces are missing.
- First tool: a dicing saw from Disco.
Connection implemented via SECS/GEM and core building blocks of the fab software built up as well.
- Lot and wafer validation, recipe management
- FDC, Run2Run and process history
- Live charts of the process values
Safety Training Web · Web application
Safety briefings managed audit-proof.
Briefings are fully traceable, including in the certification audit.
- Workplace-specific briefings must be managed and documented.
- The records are checked during certification audits.
Web application with login by personnel number and permissions via groups.
- Annual report for the current and previous year
- Email reminder before expiry
- Automatic logout after 10 minutes
Initial consultation
Talk directly to the managing director.
Rainer Broleen takes the time for your situation and tells you how things can move forward.
You name the tool, host system and time frame.
Conversation with Rainer Broleen.
You receive an assessment and a proposal for how to proceed.